Spot the Gap Before It’s Too Late.
Engineering failures aren't surprises; they are mathematically predictable. If your objectives require more effort than your team can deliver, your roadmap will fail. Stop guessing and see the data.
Use this 1-page audit to pinpoint engineering bottlenecks today, while you still have time to pivot.
A mission-critical tool for CTOs and VPs of Engineering
By the time a bottleneck surfaces in production, your options are gone.
One "At Risk" objective can trigger a domino effect across your entire quarterly plan.
Multiple high-priority goals often compete for the same specialist roles, stalling everything at once.
Plans fail because they ignore the 20-40% of capacity lost to meetings, support, and maintenance.
Missing a delivery commitment because of a "surprise" gap damages your standing with the board and stakeholders.
This template transforms "gut feelings" into an Early Decision Signal:
Instantly compare total demand against your team's actual available bandwidth.
Identify specific role-based constraints (Backend, DevOps, etc.) before they block execution.
Gain the evidence you need to split scope, shift sequencing, or add temporary capacity with confidence.
Ensure your strategic goals scale at the same pace as your team's capacity.

The framework is built on three complex data inputs to give you a definitive Status Output:
Clear units of delivery.
Bandwidth minus PTO, holidays, and incident response overhead.
Estimates based on historical delivery, not "best-case" dreams.
Automatically identify if you are "No Gap," "At Risk," or "Gap Detected".
Bottlenecks Surface.
The goal isn't to eliminate ambition; it's to align it with reality before the quarter starts. Download the 1-Page Capacity Gap Forecast Template now and secure your delivery roadmap.